This morning I saw Virgo locked at step 12 for the last time, then Eric and Benjamin switched off the laser system and the preparatory work for the EIB-SAS installation started, the work in the laser lab went on all the day.
TCS
The whole TCS system was switched off in the afternoon by Richard and Julien.
All the TCS software was switched off (RotorTCS, ChillerTCS, Shutter&Laser, IrCamTCS, PlcTCS), the TCS section was removed from the DMS.
Other
Both the CHRoCC heaters were switched off, also the two kert power-supplies was switched off (the monitoring electronics are still on).